NDA obtained planning consent for a new classroom wing attached to the rear of this delightful school in Burgess Hill. The site for the extension was unfortunately set rather close to a fine and substantial Sequoia which the MSDC Arboriculturist insisted would not disturb the ground surface which meant cantilevered foundation beams (above ground) with pads or piles to avoid disturbing the delicate fibrous root structure.